Example of a TIMES Analysis

  Time Integrated Methods Engineering System      
TIMES
   
Op No
Operation Description

Part No

 

         
  Department
Element No
Element Description
Ele Time Mins
Par Freq
Freq
Basic Mins
RA %
Std Mins
2
Pick up cover and position to bench
0.0300
1
0.0300
11
0.0333
19
4 Steps each way to tote pan
0.0075
8
0.0600
11
0.0666
1
Pick up washers
0.0200
1
0.0200
11
0.0222
18
Allowance for grasp several items
0.0010
1
0.0010
11
0.0011
1
Pick up washer from other hand and position to stud
0.0200
4
0.0800
11
0.0888
46
Pick up nut and start on stud
0.0300
4
0.1200
11
0.1332
57
Finger tighten 9 turns (4 nuts)
0.0052
9
4
0.1872
11
0.2078
49
Pick up spanner and position aside after use
0.0400
1
0.0400
11
0.0444
55
Move to next stud and position
0.0200
3
0.0600
11
0.0666
58
Tighten 4 wrist turns (4 nuts0
0.0103
4
4
0.1648
11
0.1829
7
Pick up and aside cover
0.0300
1
0.0300
11
0.0333
               
    Totals    
0.07930
 
0.8802

Example of Value Analysis Sheet

 
Value Analysis Sheet
           
               
Element No
Added Value by Element
Par Freq
Freq
Total Added Value
Non Added Value
Added Value
Non Added Value
2
0.0300
1
0.0300
0.0000
0.0300
 
19
0.0000
8
0.0000
0.0600
 
0.0600
1
0.0200
1
0.0200
0.0000
0.0200
 
18
0.0010
1
0.0010
0.0000
0.0010
 
1
0.0200
4
0.0800
0.0000
0.0800
 
46
0.0300
4
0.1200
0.0000
0.1200
 
57
0.0052
9
4
0.1872
0.0000
0.1872
 
49
0.0400
1
0.0400
0.0000
0.0400
 
55
0.0200
3
0.0600
0.0000
0.0600
 
58
0.0103
4
4
0.1648
0.0000
0.1648
 
7
0.0300
1
0.0300
0.0000
0.0300
 
               
       
Totals
 
0.7330
0.0600
       
Percent
 
92.43
7.57

 

 

What is new from TMS

TIMES

TIMES is a synthetic data blocking system designed to create process times for virtually any operation that has a defined method laid down, it can also be used as a tool for comparison of different methods or for developing new methods, for lean manufacturing engineers it proportions the work to added value and non added value automatically thus highlighting potential areas for improvement. Data is based on a Predetermined Motion Time System (PMTS)