MOST®
is the registered trade mark of H
B Maynard & Co Inc
Maxi-MOST® - PT11
2 Days
Maxi-MOST® for Long, Variable Work Cycles.
Maxi-MOST® was developed to cover long cycle operations with a high degree of cyclic
variation. A cycle time of 20 minutes would be typical. Work situations to
which Maxi-MOST® may be applied would include heavy assembly, heavy machining, process
industries and maintenance functions.|
As with Basic MOST®, the technique analyses work through the movement of objects.
However, this technique was required to absorb a comparatively large amount of method
variation whilst still maintaining a practical method description.
To facilitate this three truncated motion, sequences were developed covering parts
handling, tool handling and machine handling.
Due to their brevity, these sequences do not convey the degree of method detail that is
achieved with Basic MOST®. Instead, the technique employs a rigid form of sentence
construction to supplement its motion sequences. Apart from the sequence design, the
main differences are as follows:-
1. A distinction is made between walking in clear non restricted spaces when establishing
indices for the Distance parameter 'A' (Action Distance) covers
the "round trip" to get an
object on quantity of objects and return to the work site.
2. The "Body Motion" parameter 'B' covers all body motions.
Index values are provided for
combinations of body motions as well as single body motions.
3. Objects moved are indexed by the number of objects. The degree
of difficulty is related to a
"keyword" carrying a distinct definition
within the technique.
4. The Index Multiplier, to convert index values to time measurement
units, is 100 instead of 10.
Who Should Attend
Delegates to be trained
in Maxi-MOST® must have successfully
completed a Basic MOST® Course.
Programme Introduction
Parameter Definitions
Use of Calculation Sheet
Action Distance
Body Motions
Parts Handling
Moving Objects on a Surface
Tool Handling
- Fit & Remove Threaded Fasteners Parts I to IV
- General Tools Part 1
Day 2
Tool Use
- General Tools Part II
- Measure
Machine Handling Parts I & II
Index Value Developments
Theory of Added Variances
Data Block Construction - The "Top Down" Approach
Application Exercises